File
number: ssba0417 © South
American Pictures/ Marion Morrison With
the crack made watertight with mattresses and most of the scuttling holes sealed
with plywood, diesel-powered pumps were started on April 5th to pump out water
in the bottom of the hull. The
pumping continued through April 6 and at dawn on the 7th the ship unexpectedly
came afloat. |