File
number: ssba0299 © South
American Pictures/ Marion Morrison "A
large strop was rigged to the sheerlegs block from the estimated point of balance
aft of the above-deck part of the mast and a preventer down-haul was rigged round
the base of the mast going down to the lower deck control base." from
The Great Iron Ship by Dr Ewan Corlett. |